PARTNERING THROUGH RISK MANAGEMENT: LAKE MEAD INTAKE NO. 3 RISK MANAGEMENT APPROACH

机译:通过风险管理建立伙伴关系:需要采取措施3风险管理方法

获取原文
获取原文并翻译 | 示例

摘要

This paper presents the risk management methodology that was implemented by thernproject team, the Design-Builder, Vegas Tunnel Constructors (VTC) and the Owner,rnSouthern Nevada Water Authority (SNWA), on the Lake Mead Intake No. 3 project.rnUtilizing an innovative Risk Management approach developed by the team andrnmanaged by VTC, all parties collaborated to effectively develop a strong partneringrnapproach through the risk management process. The team met regularly and jointlyrnprepared and managed the project risk register throughout the duration of constructionrnwith guidance from a third party Risk Facilitator. Although, this technically challengingrnproject has experienced difficult times, because of the commitment of the projectrnteam to engage in partnering through the risk management process many successesrnwere achieved.
机译:本文介绍了由项目团队,维加斯隧道施工公司(VTC)的设计建造者和业主,内华达州南部水务局(SNWA)实施的米德湖3号进水口项目的风险管理方法。由团队开发并由VTC管理的风险管理方法,各方共同努力,通过风险管理流程有效地开发了强有力的合作方法。在整个施工过程中,团队定期开会,共同制定和管理项目风险登记册,并在第三方风险促进者的指导下进行。虽然,这个技术上具有挑战性的项目经历了艰难的时期,但是由于项目团队致力于通过风险管理过程进行合作,因此取得了许多成功。

著录项

  • 来源
    《》|2015年|112-116|共5页
  • 会议地点 Washington DC(US)
  • 作者单位

    Vegas Tunnel Constructors;

    Vegas Tunnel Constructors;

    Southern Nevada Water Authority;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号