首页> 外文会议>Industrial and Commercial Power Systems Technical Conference >Cable-Capacitance Discharge Time With and without the Application of Grounding Device
【24h】

Cable-Capacitance Discharge Time With and without the Application of Grounding Device

机译:电缆 - 电容放电时间和不应用接地装置

获取原文

摘要

This paper provides the inherent cable capacitance, its stored energy, its maximum transient voltage and time to discharge such voltage and energy to safe level with and without the application of the grounding device. It is known and maintenance procedures require that appropriate grounding devices be applied to electrical equipment upon its de-energizing before performing inspection or maintenance for safety reasons [1] [2]. The authors have not come across published literature describing how to determine the discharge time of inherent cable capacitance charged voltage. Shore power supply to a berthing ship is called cold-ironing operation; it helps to minimize air pollution. In the cold-ironing power system design, medium voltage heavy plug and receptacle assemblies are required to make and break shore power connections to the ship power system as the ship arrives and leaves the port after cold-ironing operation. Therefore; there was a need to know the discharge time of the cable capacitance without the application of grounding device for safety reasons. Recommendation for the future research project to develop recording/measuring device for cable capacitance voltage discharge time to validate the calculated discharge time presented in this paper is included. For safe and efficient operation of a cold-ironing operation, implementation of a grounding switch interlocked with an associated main-disconnect switch (for discharging quickly cable capacitance voltage and charged energy to ground) should be included.
机译:本文提供了固有的电缆电容,其存储的能量,其最大瞬态电压和时间,以便在施加接地装置的情况下将这种电压和能量放电到安全水平。已知并且维护程序要求在为安全原因进行检查或维护之前将适当的接地装置应用于电气设备,以出于安全原因[1] [2]。作者尚未遇到发表的文献,描述了如何确定固有电缆电容带电电压的放电时间。岸上电源到船舶被称为冷熨烫操作;它有助于最大限度地减少空气污染。在冷熨烫电力系统设计中,随着船舶到达并在冷熨烫操作后到达港口,需要中压力塞和插座组件。所以;由于安全原因,需要了解电缆电容的放电时间而不应用接地装置。对于未来的研究项目建议,为电缆电容电压放电时间开发录制/测量装置,以验证本文呈现的计算出放电时间。为了安全有效地操作冷熨烫操作,应包括与相关的主断开开关联锁的接地开关(用于将快速电缆电容电压和充电能量放电到地)的接地开关的实现。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号