Study on rehabilitation of traditional settlements after the Lombok earthquake in 2018, Indonesia Part 1 People’s Adaptation on Disaster Temporary Shelter in Bayan Timur RT-1 Village

机译:2018年龙木病地震后传统定居点康复研究,印度尼西亚第1人对巴彦时间灾区灾害临时住房的适应

获取原文

摘要

Lombok earthquake in 2018 occurred continuously on July29th, August 5th and August 9th in 5.9-6.4 Richter scale. Manyearthquake still occurred after that time. Based on Indonesiangovernment official statistic data, 445,343 people were reportedlost their houses. According to Presidential Instruction Letter No.5 Year 2018, Lombok Recovery Process consisted of three stages:Emergency Stage (July-August 2018), Rehabilitation Stage(September-December 2018) and Reconstruction Stage(September 2018-March 2019). Due to limited resources inreconstruction stage, the progress was expanded from thescheduled time. In August 2019, government housing aidreconstruction project in Bayan Timur-RT 1 Village were stillunder construction and have not been finished yet. Fortunately,community at this village received donation of temporary sheltermaterials from a local NGO: Bumi Tangguh Foundation onNovember 2018. The temporary shelter made of galvanizedaluminum bar for its main structure, zinc aluminum panel for theroof material and bamboo woven for the wall material and wallpartitions.
机译:龙目岛地震2018年七月不断发生29日,8月5日和8月9日在5.9-6.4尺度。许多发生地震仍然发生在那后。基于印度尼西亚语政府官方统计数据,报告了445,343人失去了他们的房子。据总统说明书。2018年5年,Lombok恢复过程包括三个阶段:急诊阶段(2018年7月至8月),康复阶段(2018年9月至12月)和重建阶段(2018年9月至2019年3月)。由于资源有限重建阶段,进展从计划的时间。 2019年8月,政府住房援助八南Timur-RT 1村的重建项目仍然存在正在建设中,尚未完成。幸运的是,这个村庄的社区收到临时庇护所捐赠来自当地非政府组织的材料:Bumi Tanguh基金会2018年11月。由镀锌制成的临时庇护所其主要结构的铝棒,锌铝板屋顶材料和竹木为墙壁材料和墙壁编织分区。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号