首页> 外文会议>World Environmental and Water Resources Congress >Evaluation of Facilities Alternatives for Spreading Stormwater Flows Overland to Promote Large Scale Wetlands Rehabilitation
【24h】

Evaluation of Facilities Alternatives for Spreading Stormwater Flows Overland to Promote Large Scale Wetlands Rehabilitation

机译:对设施的评价蔓延雨水的替代品流动陆上,以促进大规模湿地康复

获取原文

摘要

In the context of a major Florida wetlands restoration project, it was necessary to distribute flows over a land area on a continuing basis in a way that promoted recovery of overland flows and recharge to a more natural condition. Complicating this requirement was the limited available head to drive hydraulic processes, because of the very flat coastal Florida landscape, and the need to deal with all levels of flow from major flood events down to gentle summer storms, all in the complete absence of defined downstream drainage works. A substantial literature review was conducted to evaluate prior approaches to this problem. Parallels were discovered, principally in the agricultural literature, but closely similar projects were not encountered. Solutions considered ranged from concrete hydraulic structures with energy dissipation and overflow weir systems, to simple trenches orthogonal to the landform gradients. It was concluded that although they might be effective, concrete structural options were costly, were prone to excessive head losses, and did not lend themselves to integration into the natural landscape. Overflow trenches were attractive in their simplicity, but raised the specter of eventual cut-down and development of preferential flow paths rather than development of broad wetland areas. The preferred solution consisted of long spreader berms with numerous controlled overflow points. This option not only integrates nicely with the prevailing landscape, but can be adapted in the long term as management of the system is adjusted to meet the needs of the evolving ecosystem during its recovery period.
机译:在佛罗里达州大型湿地恢复项目的背景下,有必要在持续的基础上分配陆地面积的流量,以促进陆上流动的复苏并充电到更自然的条件。这种要求使这一要求是有限的,可以推动液压过程,因为沿海佛罗里达州沿海普通的沿海景观,以及从主要洪水事件中处理各级流动的需求到温和的夏季风暴,都在完全没有定义的下游的情况下排水作品。进行了大量文献综述,以评估此问题的先前方法。 Parballels被发现,主要是在农业文献中,但没有遇到类似的项目。考虑的解决方案远离混凝土液压结构,通过能量耗散和溢出堰系统,与地形梯度正交的简单沟渠。得出结论是,虽然它们可能是有效的,但具体的结构选择昂贵,易于头部损失过度损失,并没有赋予自然景观。溢出的沟渠的简单性具有吸引力,但提出了最终降低和开发优惠流动路径的幽灵,而不是广泛的湿地区域的发展。优选的溶液由长的散布机,具有许多受控溢出点。此选项不仅集成了普遍的景观,但可以长期调整,因为调整系统的管理以满足恢复期间的不断变化的生态系统的需求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号