首页> 外文会议>World Environmental and Water Resources Congress >Hydraulic Simulation and Variable Speed Pump Selection of a Dual-function Pumping Station: Pumping Treated Water to a Reclaimed Water System or Deep Injection Well System
【24h】

Hydraulic Simulation and Variable Speed Pump Selection of a Dual-function Pumping Station: Pumping Treated Water to a Reclaimed Water System or Deep Injection Well System

机译:双功能泵站的液压仿真和变速泵选择:将处理水泵送到再生水系统或深注射井系统

获取原文

摘要

The Three Oaks Wastewater Treatment Facility, located in Fort Myers, Florida, is owned and operated by Lee County Utilities (LCU). The treated effluent will be pumped into a 6-mgd reclaimed water system if the water quality meets FDEP (Florida Department of Environmental Protection) requirements. Otherwise, the plant effluent will be pumped into deep injection well system for further treatment. A total of four pumps including one standby pump were proposed. For the reclaimed water system, the hydraulic simulation using WaterCAD suggests that the design flow and head for each pump shall be 1500 gpm and 100 ft, respectively. For the deep injection well system, engineering calculations and on-site test recommend that the design flow and head for each pump shall be 1800 gpm and 140 ft, respectively. In Florida, complex effluent pumping systems are commonly preferred because of extensive reuse of treated effluent and a seasonal wet weather disposal using deep injection wells or ASR (Aquifer Storage and Recovery) wells. Therefore, only one pumping station with one set of pumps is selected, per LCU's request. This challenging task leads to an ideal selection of variable speed pumps in order to meet the two very different performance criteria. The hydraulic simulation and engineering calculations both prove that the selected variable speed pumps can effectively meet both two scenarios (reclaimed water system and deep injection well system) without extra costs of another pumping station and additional four pumps.
机译:这三个橡木污水处理设施位于佛罗里达州迈尔斯堡,由李县公用事业(LCU)拥有和运营。如果水质符合FDEP(佛罗里达州环保)要求,将泵入6 MGD再生水系统中的处理过水。否则,将植物流出物泵入深注入井系统以进行进一步处理。提出了共有四个包括一个备用泵的泵。对于再生水系统,使用Watercad的液压模拟表明每个泵的设计流程和头部分别为1500 GPM和100英尺。对于深注入井系统,工程计算和现场测试建议每个泵的设计流程和头部分别为1800 GPM和140英尺。在佛罗里达州,复杂的流出物泵送系统通常是优选的,因为使用深注射孔或ASR(含水层储存和恢复)井进行了广泛的处理过水和季节性潮湿的天气处理。因此,每个LCU的请求只选择一个带有一组泵的泵站。这一具有挑战性的任务导致了理想的变速泵选择,以满足两个非常不同的性能标准。液压仿真和工程计算既证明,所选变速泵可以有效地满足两种情况(再生水系统和深注入井系统),而无需另一次泵站和额外的四个泵。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号