Keeping the Water Moving: Solving Pressure Problems with Multiple Constraints in Stillwater, Oklahoma

机译:保持水迁移:俄克拉荷马州斯蒂尔沃特的多个约束解决压力问题

获取原文

摘要

The City of Stillwater (City) has experienced explosive growth in the southwest portion of the City's service area. The service area includes a wide range of development, from areas within the City to a large portion of City owned rural service areas and wholesale customers. This growth combined with prolonged drought led to operational water pressures of 6 pounds per square inch (psi) at customer meters during peak demands of 2011. This area of the city includes more than 9 square miles of land and six different pressure zones due to significant changes in terrain. The City envisioned a delivery program, "Water 2040," to not only deliver water supply at the required pressure to meet current demands, but also to address the needs of customers through the year 2040. The City's multiple objectives and constraints were established as: (1) ensure minimum pressure of 45 psi at all locations from 2015 through 2040; (2) limit phasing to $30 million (M) per loan to satisfy a Trust Indenture Limitation, with projected total program cost of $93.2 M; (3) maintain water quality throughout all phases; (4) incorporate risk and resiliency planning while limiting oversizing; (5) meet average day, maximum day, and fire flow (where applicable) requirements; (6) increase system storage from 0.5 million gallons (MG) to 2.5 MG; (7) meet Oklahoma Department of Environmental Quality (DEQ) consent order deadlines for water pressure improvements and unpermitted facilities To identify the optimal approach for efficiently delivering the Water 2040 Program, the City incorporated all of the objectives and constraints into a decision matrix that was fueled by hydraulic modeling and prioritization. The City identified the phasing and has successfully constructed 3 pump stations, 9 miles of pipe, and 2 elevated water storage tanks to meet the goals of the Water 2040 Program. The program will continue to deliver an additional 7 mi of pipe and a new water treatment plant (WTP) finished water pump station.
机译:斯蒂勒沃特(市)在城市服务区的西南部爆炸增长经历过爆炸性增长。服务区包括各种各样的开发,从城市内的区域到大部分城市拥有的农村服务区和批发客户。这种增长结合了延长的干旱导致2011年需求的客户仪表中每平方英寸(PSI)的运营水压力为6磅/平方英尺(PSI)。该市该地区包括超过9平方英里的土地和六个不同的压力区,由于重要地形的变化。该市设想了一个交付计划,“水2040”,不仅可以在所需的压力下提供供水,以满足当前的需求,也可以通过2040年来满足客户的需求。该市的多目标和制约因素是: (1)从2015到2040年确保所有地点的最低压力为45 psi; (2)限制每次贷款3000万美元(M),以满足信任契约限制,预计总方案成本为93.2米; (3)在所有阶段保持水质; (4)限制超大的同时包含风险和弹性计划; (5)达到平均日,最大一天和火灾(适用)要求; (6)将系统储存从0.5百万加仑(MG)增加到2.5毫克; (7)符合俄克拉荷马州环境质量部(DEQ)同意序命令水压改进和未经许可的设施,确定有效地交付水2040计划的最佳方法,该城市将所有目标纳入其中的决策矩阵通过液压建模和优先排序推动。该市确定了阶梯,已成功建造了3个泵站,9英里的管道,2个升高的储水箱,以满足水2040节目的目标。该计划将继续提供额外的7英里的管道和新的水处理厂(WTP)成品水泵站。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号