In the beginning of 2008, southern China had experienced extreme low temperature, heavy rain, snow, and freezing weather. This extreme weather had impaired the southern area power grid greatly and threatened the security and stability running of power system and power supply. The paper introduces the China southern area power grid basic disaster situation. Based on the China southern area power grid characters and the disastrous weather characters, it reviews the whole accident process of the 500kV main power grid in the snow disaster. Then summarizes the typical characteristics in the disaster of China southern area 500kV main power grid, and reveals the main problems exposed in the southern area 500 kV main power grid. The problems include: long distance large capacity transmission line proportion, the power supply development is not harmonious with the power grid development, and the 500kV transmission line corridor selection problem, etc. Some solutions and recommendations in power supply development and power grid development are given out according to the problems in the end.
机译:2008年初,中国南方经历了极端的低温,大雨,雪和冻结天气。这种极端天气极大地损害了南方地区电网,并威胁到电力系统和电源的安全性和稳定性运行。本文介绍了中国南方电网基本灾害情况。基于中国南方电网特征和灾难性的天气性格,它审查了500kV主电网在雪灾中的整个事故过程。然后总结了中国南部面积500kV主电网灾害中的典型特征,并揭示了南方500 kV主电网暴露的主要问题。这些问题包括:长距离大容量传输线比例,电源开发与电网开发不起作用,500kV输电线路走廊选择问题等。一些解决方案和电力电网开发中的建议和推荐。根据最后的问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号