Selection of the Order of the Construction of Structures of a Multiple-Structure Project, Taking Into Account Time-Cost Optimisation

机译:选择多结构项目结构的施工顺序,考虑到时间成本优化

获取原文

摘要

The paper presents a linear model of time-cost optimisation which can aid in the process of the selection of the order of the construction of structures, as well as during the development of a timetable of a multiple-building construction project by a general contractor. The proposed model takes into account indirect costs, direct costs, contractual penalties associated with discontinuous work by work brigades, contractual penalties associated with failing to meet directive deadlines, as well as rewards for completing a structure ahead of a directive dead-line. In order to analyse various orders, the authors used the bruteforce method. The operation of the model has been presented on a calculations example. A lowering of the total costs of the carrying out of a multiple-building construction project equal to a level of 2-5% in comparison to a random solution has been obtained. The model can be useful during the negotiation of directive deadlines or the size of the contractual penalties for delays and rewards for completing a project ahead of schedule.
机译:本文介绍了时间成本优化的线性模型,可以帮助选择结构的构建顺序的过程,以及通过一般承包商开发多建筑物建设项目的时间表。该拟议模型考虑了间接成本,直接成本,与不连续工作的直接成本,与工作之行有关,与未能满足指令截止日期的合同处罚,以及在指令死线前完成结构的奖励。为了分析各种订单,作者使用了BruteForce方法。已经在计算示例上呈现了模型的操作。已经获得了与随机解决方案相比,多建筑施工项目的执行等于2-5%等于2-5%的总成本的降低。该模型在谈判期限或延迟处罚的谈判规模期间,该模型可能是有用的,以便提前完成项目的延误和奖励。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号