首页> 外文会议>Electrical Electronics Insulation Conference, 1989. Chicago '89 EEIC/ICWA Exposition., Proceedings of the 19th >Initial experience in the Snowy Mountains Scheme with the PDA andinstallation and use of permanent capacitive couplers on hydrogenerators
【24h】

Initial experience in the Snowy Mountains Scheme with the PDA andinstallation and use of permanent capacitive couplers on hydrogenerators

机译:掌上电脑和PDA在“雪山计划”中的初步经验在水电上安装和使用永久性电容耦合器发电机

获取原文
获取外文期刊封面目录资料

摘要

The author describes the initial experiences of the SnowyMountains Hydro-Electric Authority with Ontario Hydro partial dischargeanalyzer (PDA) technology. The factors necessitating modification of thestandard XLPE (cross-linked polyethylene) cable coupler and itsinstallation method are described. Some initial PDA test measurementresults and their interpretation are presented. Comparisons are madebetween PDA and other discharge detector measurements. The significantimprovement in the Authority's knowledge of the condition of itsgenerator stator windings as a result of initial PDA measurements isnoted, and it is concluded that PDA condition monitoring will be animportant tool in future maintenance strategic planning in the SnowyMountains Scheme
机译:作者介绍了Snowy的初步经验。 安大略水电部分放电的山区水电局 分析仪(PDA)技术。需要修改的因素 标准XLPE(交联聚乙烯)电缆耦合器及其 描述了安装方法。初步的PDA测试测量 介绍了结果及其解释。进行比较 在PDA和其他放电检测器之间进行测量。重大的 改善管理局对其情况的了解 初始PDA测量的结果是发电机定子绕组为 注意,并得出结论,PDA状态监视将是 Snowy未来维护策略规划的重要工具 山区方案

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号