首页> 外文期刊>PACE: Process & Control Engineering >Overhauling the Snowy Scheme: Upgrading Australia's Snowy Mountains Hydroelectric Scheme s legacy control and information systems presents challenges on many fronts
【24h】

Overhauling the Snowy Scheme: Upgrading Australia's Snowy Mountains Hydroelectric Scheme s legacy control and information systems presents challenges on many fronts

机译:全面改革雪域计划:升级澳大利亚雪山水电计划的旧有控制和信息系统在许多方面都带来了挑战

获取原文
获取原文并翻译 | 示例
       

摘要

LOCATED in Australia's Southern Alps, the Snowy Mountains Hydroelectric Scheme was built between 1949 and 1974 to realise two vital goals: to provide water for irrigation purposes and also electricity from hydroelectric generation. The waters of the Snowy and Eucumbene Rivers are diverted to the rich farming areas of the Murray-Darling Basin, and pass en-route through the Scheme's two pumping stations and seven hydroelectric power stations.
机译:雪山水电计划位于澳大利亚的南阿尔卑斯山,于1949年至1974年之间建立,以实现两个重要目标:为灌溉用水和水力发电提供水。斯诺伊河和Eucumbene河的水被转移到Murray-Darling盆地丰富的农业地区,并途经该计划的两个抽水站和七个水力发电站。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号