首页> 外文会议>Symposia on light metal;TMS annual meeting exhibition >THE QUICK SHUT DOWN AND RESTARTING OF 291 kA PRE-BAKED POTLINE AT JSC 'RUSAL SA-YANOGORSK? FROM MAY TO AUGUST 2011
【24h】

THE QUICK SHUT DOWN AND RESTARTING OF 291 kA PRE-BAKED POTLINE AT JSC 'RUSAL SA-YANOGORSK? FROM MAY TO AUGUST 2011

机译:快速关闭并重新启动291 kA“ RUSAL SA-YANOGORSK? 2011年5月至8月

获取原文

摘要

Sayanogorsk and Khakas aluminum smelters faced with the serious risk of emergency shut down due to the railway bridge destruction used for the raw materials supplying, after the natural disaster on May 7, 2011. In order to prevent the emergency shutdown UC "RUSAL" decided to reduce temporarily the production volume. As a result, the line amperage was decreased significantly; some amounts of old and sick pots were shunted out in each potline, besides the entire line consisting of 179 pots with a current of 291 kA was disconnected within 2 days. After the resumption of raw materials supply the potline was restarted within 2.5 months. This article describes the sequence of events from the decision to shut down the line to the full production recovery.
机译:Sayanogorsk和Khakas铝冶炼厂在2011年5月7日发生自然灾害后,由于用于原材料供应的铁路桥梁毁坏而面临着严重的紧急停车风险。为了防止紧急停车,UC“ RUSAL”决定采取以下措施:暂时减少产量。结果,线路的安培数显着降低。每个罐中分流了一些旧罐和生病罐,除了两天之内断开了由179个罐组成的整条管线(电流为291 kA)。在恢复原材料供应后,食盐水在2.5个月内重新开始。本文介绍了从决定关闭生产线到全面生产恢复的事件顺序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号