The BOSS which is also called the set-on branch connection is a new structure used in nuclear power plant in recently years. The BOSS weld failure may lead to borated water leakage, and it will probably affect the safety of the equipment in the pressurized water reactor nuclear power plants (PWRs). In this study, causes of BOSS weld failures were studied first. Then through the technique features of radiographic inspection, an applicable inspection technique for BOSS welds in PWRs was summarized. Combining the experience feedback of BOSS weld failures at home and abroad, a useful maintenance solution was proposed. In the end, some feasible suggestions for improving the quality of BOSS welds were established from the point of views of design process, welding process and inspection process.
机译:BOSS,也称为建立分支连接,是近年来在核电站中使用的一种新结构。 BOSS焊接故障可能会导致硼酸漏水,并且可能会影响压水堆核电站(PWR)中设备的安全性。在这项研究中,首先研究了BOSS焊接失败的原因。然后通过射线照相检查的技术特点,总结了适用于压水堆中BOSS焊缝的检查技术。结合国内外BOSS焊接故障的经验反馈,提出了一种有用的维修解决方案。最后,从设计过程,焊接过程和检查过程的角度,提出了一些提高BOSS焊接质量的可行建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号