Large Diameter Structural Watermain Rehabilitation in Utah: 30-inch Tight-fit HDPE Case Study

机译:犹他州大直径结构水域康复:30英寸紧身的HDPE案例研究

获取原文
获取外文期刊封面目录资料

摘要

In 2019, the Weber Basin Water Conservancy District installed the first tight-fit HDPE liner for a large diameter drinking (culinary) water pipeline in the state of Utah. The project included rehabilitation of 1.5 miles of 30-inch and 27-inch diameter AWWA C303 "Bar-wrapped" and non-standard non-cylinder reinforced concrete drinking water pipeline originally installed in 1955. The design basis was carried out utilizing a “partially deteriorated” host pipe condition for the majority of the alignment with a fully-deteriorated liner design in select locations based on findings of hydraulic modeling and CCTV observations.Pressures in excess of 100 psi, steep slopes greater than 40 percent through a valley, and a narrow corridor within an established residential community were some of the construction challenges. Successful rehabilitation of the 9 MGD pipeline was accomplished through careful collaboration between owner, engineer and construction team. Custom proofing pigs were fabricated to detect and grind joint defects, and a highly successful community relations campaign was implemented for stakeholders along the alignment.This paper will discuss the planning, installation, and testing of the liner from the perspectives of the engineering team and specialty liner installers with emphasis on engineering considerations during construction, and challenges encountered during installation, and lessons learned.This case study is intended to be a useful reference for pipeline designers, city asset managers, and contractors considering similar rehabilitation projects.
机译:2019年,韦伯盆地水利区安装了第一件紧身衣服衬垫,用于犹他州的大直径饮用(烹饪)水管。该项目包括康复为1.5英里的30英寸和27英寸直径为AWWA C303“拨打”和非标准的非圆柱钢筋混凝土饮用水管道,最初安装在1955年。设计基础是利用“部分”进行的基于液压建模和CCTV观测的发现,在选择位置的完全恶化的衬里设计中劣化“主机管道条件。超过100psi的压力超过100 psi,陡峭的斜坡通过山谷大于40%,并且在既定的住宅社区内的狭窄走廊是一些施工挑战。通过主人,工程师和建筑团队之间的认真合作,完成了9名MGD管道的成功康复。定制打样猪被制作以检测和研磨关节缺陷,并为沿着一致性的利益攸关方实施了高度成功的社区关系运动。本文将从工程团队和专业衬里安装人员的角度讨论班轮的规划,安装和测试,重点在建设期间强调工程考虑,以及在安装过程中遇到的挑战和经验教训。本案例研究旨在考虑类似康复项目的管道设计师,城市资产管理人员和承包商是一个有用的参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号