DESIGN AND CONSTRUCTION OF THE SUMMIT SENIOR CARE FACILITY INTO THE SIDE OF AN UNSTABLE CALIFORNIA HILLSIDE

机译:不稳定的加利福尼亚山坡一侧的高级护理设施的设计和建造

获取原文

摘要

With stable building sites becoming scarce in the greater San Francisco Bay Area, the new Summit SeniorCare Facility is being built into the side of an unstable hillside adjacent to the San Ramon Regional MedicalCenter in San Ramon, California. This hillside has had a long history of instability and the site of the newSenior Care Facility required excavation into both a historic old landslide and a more recent active landslide.After a thorough geotechnical study, it was concluded that the best way to build the new facility would beto construct a tied-back retaining wall in the area of the old landslide, since it extended off-site onto twoadjacent properties, and remove the active landslide and replace it with compacted fill before cutting intoits toe area with an additional tied-back retaining wall. The design was further complicated by the proximityof the site to several active faults. In the area of the old landslide, the combination of an ascending slopebehind the wall, landslide forces and seismic forces resulted in total design pressures between 365 to 4,575PSF for a wall with a maximum height of 30 feet. The wall for the old landslide was constructed by firstdrilling and placing steel soldier piles in concrete. The tip of the soldier piles extended a minimum of 12feet below the landslide plane that was up to 36 feet below the bottom of the wall. Permanent doublecorrosion protected tiebacks were then installed through the soldier beams and anchored below the slideplane. A shotcrete facing was then installed on the face of the wall.
机译:在大旧金山湾地区,由于稳定​​的建筑工地变得稀缺,新的高级首脑会议 护理设施建在邻近San Ramon Regional Medical的不稳定山坡一侧 加利福尼亚州圣拉蒙市的中心。这个山坡有很长的不稳定历史,而新山的遗址 高级护理设施需要挖掘历史悠久的旧滑坡和较新的活跃滑坡。 经过全面的岩土研究,得出的结论是,建造新设施的最佳方法是 在旧滑坡区建造一条绑扎式挡土墙,因为它在场外延伸到两个 相邻的属性,并移除有效的滑坡,并在压实之前将其替换为压实的填充物 它的脚趾区域带有一个附加的绑扎式挡土墙。由于邻近,设计进一步复杂化 站点出现几个活动故障。在旧滑坡地区,一个上升斜坡的组合 在墙后,滑坡力和地震力导致总设计压力在365至4,575之间 PSF,用于最大高度为30英尺的墙。旧滑坡的墙是在第一时间建造的 在混凝土中钻孔和放置钢制士兵桩。士兵的枪尖至少延伸了12 距滑坡平面以下36英尺以下的滑坡平面2英尺。永久双 然后通过士兵横梁安装防腐蚀的后绑带,并将其固定在滑轨下方 飞机。然后将喷浆面安装在墙面上。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号