Integrated Schedule Information Model for Airport Construction Projects

机译:机场建设项目综合进度信息模型

获取原文

摘要

Based on the experience of developing and tracking the construction schedules for three airport projects, this article presents an integrated schedule information model for managing the development and tracking of the total project scheduling. It is a systems engineering approach to plan scheduling for airport construction projects, the methods of developing the total project scheduling include analyzing the total schedule target, and developing of an overall schedule by level, zone and stage. And the methods were to develop an integrated three-dimensional schedule information conceptual model. The methods of tracking the schedule plan include schedule target breakdown, duty assignment, establishment of a schedule information communication platform and schedule information reporting system, and execution of dynamic control. The result is a scientifically rigorous and robust tool for construction management of airport projects. And it becomes an important component of the overall project management for airport headquarters to develop and track schedule plan system.
机译:基于制定和跟踪三个机场项目的建设进度的经验,本文提出了一个集成的进度信息模型,用于管理整个项目进度的开发和跟踪。它是用于计划机场建设项目计划的系统工程方法,制定总项目计划的方法包括分析总计划目标,以及按级别,区域和阶段制定总体计划。并且该方法是开发集成的三维进度计划信息概念模型。跟踪进度计划的方法包括进度目标细分,任务分配,进度信息通信平台和进度信息报告系统的建立以及动态控制的执行。结果是为机场项目的施工管理提供了科学严谨且功能强大的工具。制定和跟踪进度计划系统成为机场总部整体项目管理的重要组成部分。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号