Technical Challenges and Legal Barriers to Pre-start a Grid based on Wind Power in the Western Part of Sweden

机译:瑞典西部基于风能的电网预启动所面临的技术挑战和法律障碍

获取原文

摘要

Increased social cost of outages, declining trust of the grid companies and their tariffs and new technical possibilities have made it interesting to investigate if it would be possible to pre-start a part of a grid during a major outage based on available wind power. Since the installation of wind power has increased a lot during the latest years in the western part of Sweden an investigated has been made for this region. It is not without challenges to pre-start a grid but seems possible. The technical challenges are several but possible to handle without significant investments. The legal barriers are unknown since it has not been tested in full scale, but the regulations seem to be in place for a successful implementation. However, there are also other possibilities and challenges that could support or hinder a pre-start. It is a new opportunity that seems well worth to explore further, to increase the value of the next generation of power system.
机译:停电造成的社会成本增加,电网公司的信任度下降以及其电价和新的技术可能性,使人们有兴趣研究是否可以根据可用的风力在重大停电期间预先启动一部分电网。由于最近几年来瑞典西部的风力发电量增加了很多,因此对该地区进行了调查。预启动网格并非没有挑战,但似乎是有可能的。技术挑战很多,但无需大量投资即可解决。由于尚未经过全面测试,因此法律上的障碍是未知的,但法规似乎已为成功实施做好了准备。但是,还有其他可能性和挑战可能会支持或阻碍预启动。这似乎是一个值得进一步探索的新机会,以增加下一代电力系统的价值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号