首页> 外文会议>AREMA annual conference >Louisville and Indiana Railroad Track Upgrade Program
【24h】

Louisville and Indiana Railroad Track Upgrade Program

机译:路易斯维尔和印第安纳州铁轨升级计划

获取原文

摘要

The paper and presentation will provide details on the Louisville and Indiana Railroad (LIRC) Track Upgrade project concluding in 2019. The major infrastructure improvement project will support increased train traffic over the 106 mile LIRC line. These changes will provide enhanced rail access for the Port of Indiana-Jeffersonville, increase capacity and efficiency along this corridor and improve connectivity for manufacturers, farmers, industrial shippers and other contributors to the area's economic growth. The improvements will take the line from 263k at 25mph to 286k at 49mph. The paper and presentation will focus on both the program management and implementation of multiple simultaneous construction contracts which include 100 miles of roadbed and drainage improvements, 105 miles of new CWR, various bridge improvements including major pin truss replacement, and rehabilitation of all turnouts and grade crossings over a 4 year span.
机译:该文件和演示文稿将提供有关路易斯维尔和印第安纳州铁路(LIRC)轨道升级项目的详细信息,该项目将于2019年结束。主要的基础设施改善项目将支持106英里LIRC线路上增加的火车通行量。这些变化将为印第安纳-杰斐逊维尔港提供更多的铁路通道,提高该走廊的运力和效率,并改善制造商,农民,工业托运人和其他对该地区经济增长的贡献。改进后的产品线将从25mph的263k提升到49mph的286k。本文和演示文稿将着重于项目管理和多个同时施工合同的实施,包括100英里的路基和排水系统改进,105英里的新CWR,各种桥梁改进,包括主要的销桁架更换以及所有道岔和坡度的修复跨越4年的时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号