【24h】

Status of Renewable Energy Projects in Egypt

机译:埃及可再生能源项目的状况

获取原文

摘要

Egypt's economic development hinges on the energy sector. To meet burgeoning energy demand, the government's Integrated Sustainable Energy Strategy, ISES 2035, involves stepping up the use of renewables and improving energy efficiency in the power sector. The government has set targets for renewables to make up 42% of the country's electricity mix by 2035, based on rapid solar and wind deployment. Energy subsidies has been a fiscal burden on the country's budget constituting 7% of GDP equivalent to the expenditure of EGP 120 billion in 2013/2014. In July 2014, the Prime Minister issued the decree 1257 for year 2014 that introduced a five-year plan to phase out the electricity subsidies by fiscal year 2018/2019. This has positively encouraged the roll-out of renewable energy and energy efficiency programs. Egypt could realistically, and cost-effectively, supply 53% of its electricity mix from renewables by 2030, double the share to be expected from current plans and policies. With renewable power, heat and fuels all factored in, renewables could provide 22% of Egypt's total final energy supply in 2030, up from just 5% overall in 2014. The renewable equipment market is potentially worth billions of dollars. Egypt intends to supply 20 percent of generated electricity from renewable sources by 2022, with wind providing 12 percent, Hydro power 5.8 percent, and Solar 2.2 percent. Egypt is, therefore, committed to the widespread deployment of renewable energy technologies. To date, the country's total installed capacity of renewables amounts to 3.7 gigawatts (GW), including 2.8 GW of hydropower and around 0.9 GW of solar and wind power. As specified in the ISES to 2035, the Egyptian government has set renewable energy targets of 20% of the electricity mix by 2022 and 42% by 2035.
机译:埃及的经济发展取决于能源部门。为了满足迅速增长的能源需求,政府的《综合可持续能源战略》(ISES 2035)涉及加强对可再生能源的使用,并提高电力部门的能源效率。根据快速部署的太阳能和风能,政府已经设定了到2035年可再生能源占该国电力结构42%的目标。能源补贴一直是该国预算的财政负担,占其GDP的7%,相当于2013/2014年的支出为1200亿埃及镑。 2014年7月,总理发布了2014年第1257号法令,其中引入了一项五年计划,计划在2018/2019财年之前逐步淘汰电力补贴。这积极地推动了可再生能源和能源效率计划的推出。到2030年,埃及可以现实且具有成本效益的方式将其53%的电力组合来自可再生能源,这是目前计划和政策预期的两倍。加上可再生能源,热能和燃料,到2030年,可再生能源将提供埃及最终能源供应总量的22%,而2014年仅为5%。可再生设备市场潜在价值数十亿美元。埃及计划到2022年将可再生能源发电量的20%供给,其中风能提供12%,水力发电5.8%,太阳能2.2%。因此,埃及致力于广泛部署可再生能源技术。迄今为止,该国可再生能源的总装机容量为3.7吉瓦(GW),其中包括2.8吉瓦的水力发电和约0.9吉瓦的太阳能和风能。根据ISES到2035年的规定,埃及政府设定了可再生能源目标,到2022年占电力结构的20%,到2035年占42%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号