首页> 外文会议>Conference on nuclear training and education >NuScale SMR Transformation of Traditional Site Staffing Levels
【24h】

NuScale SMR Transformation of Traditional Site Staffing Levels

机译:传统站点人员级别的NuScale SMR转换

获取原文

摘要

The NuScale SMR design presents the nuclear industry with the opportunity to transform the traditional site organization structures for nuclear facilities and in turn significantly reducing the cost associated with staffing. The opportunity to reduce O&M cost for the owner and operators of a NuScale SMR is based on its inherently safe design, passive features, fail-safe protection systems, lack of manual operator actions in the first 72 hours following a DBE, and high degree of automation. The O&M staffing levels will be significantly less than the current operating nuclear plants in the United States based on the topics such as the revised Emergency Planning Zones, physical security initiatives, and changes being pursued regarding on-site licensed operator staffing requirements, operator training programs, and implementation of a NuScale Fleet Support Services group. In 2016 NuScale laid the foundation for establishing the technical justification for operating 12 nuclear power plants from a single control room with a staff of only six licensed operators by completing a Staffing Plan Validation where crews demonstrated success in completing very challenging scenarios in a control room simulator. In 2018 NuScale completed the Integrated System Validation (ISV), a comprehensive performance-based testing of the hardware, software, and personnel elements that are a NuScale plant control room. The ISV confirmed the control room staffing and concept of operations. This was completed as part of the Design Certification Application which is an industry first.
机译:NuScale SMR设计为核工业提供了机会,以改变传统的核设施现场组织结构,进而显着降低与人员配备相关的成本。为NuScale SMR的所有者和运营商降低运维成本的机会是基于其固有的安全设计,被动功能,故障安全保护系统,DBE之后的前72小时缺乏手动操作员行动以及高度的安全性。自动化。根据诸如修订后的应急计划区,人身安全计划以及正在就现场许可的操作员人员配备要求,操作员培训计划进行更改等主题,O&M人员配备水平将大大低于美国当前正在运行的核电厂以及NuScale舰队支持服务小组的实施。 2016年,NuScale通过完成人员配备计划验证(工作人员在控制室模拟器中成功完成非常具有挑战性的场景)展示了成功的经验,奠定了从单个控制室仅由六名持照运营商人员运营12座核电站的技术论证的基础。 2018年,NuScale完成了集成系统验证(ISV),这是对作为NuScale工厂控制室的硬件,软件和人员要素进行的基于性能的全面测试。 ISV确认了控制室的人员配备和运营概念。这是业界首创的设计认证申请的一部分。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号