MANAGING GEOTECHNICAL RISK IN RAILROAD DESIGN AND CONSTRUCTION

机译:管理铁路设计和施工中的岩土工程风险

获取原文

摘要

In the early stages of railroad engineering and construction, railroads were constructed on "good ground" (i.e., firm and dry ground). However, the amount of good ground available for railroad expansion is increasingly difficult to find, leaving much of recent railroad expansion to "bad ground" (i.e., soft and wet ground), which can increase geotechnical risk on a construction project. The railroad industry's view of geotechnical risk has changed little. Borings are still generally spaced at half-mile intervals, and there is pressure on geotechnical engineers to help win projects by reducing geotechnical scope and budgets. Geotechnical engineers often work as subconsultants to a prime design consultant, who may not appreciate the increased risk associated with reduced geotechnical scope and budget because they are trying to win a low-bid competition. Railroads are increasingly trying to reduce capital and maintenance expenses, putting additional pressure on design and construction projects. Geotechnical risk is often the biggest source of cost and schedule increases during construction; however, geotechnical risk is frequently overlooked, resulting in significant changes that affect the original design, construction cost and schedule. This paper discusses the management of geotechnical risk during design and construction of a few railroad construction projects, and summarizes the design changes made during construction and the effects of these changes on cost and schedule, many of which could have been avoided with proper geotechnical risk management. The paper closes with recommendations for geotechnical risk assessment and management for railroad projects, and the benefits to the railroad industry.
机译:在铁路工程和建设的早期阶段,铁路是在“良好的地面”(即牢固而干燥的地面)上建造的。但是,越来越难以找到可用于铁路扩建的良好地面,将最近的铁路扩建大部分留给了“不良地面”(即软土地和湿地面),这会增加建筑项目的岩土工程风险。铁路行业对岩土工程风险的看法变化不大。钻孔通常仍以半英里为间隔,并且对岩土工程师施加压力,要求它们通过减少岩土工程范围和预算来赢得项目。岩土工程工程师通常是首席设计顾问的顾问,他们可能不希望因降低土力工程范围和预算而增加风险,因为他们试图赢得低价竞争。铁路越来越试图减少资本和维护费用,给设计和建设项目带来额外的压力。土力工程风险通常是最大的成本来源,施工期间进度会增加;然而,岩土工程风险经常被忽视,从而导致重大变化,从而影响原始设计,施工成本和进度。本文讨论了一些铁路建设项目在设计和施工过程中的岩土风险管理,并总结了在施工过程中进行的设计变更以及这些变更对成本和进度的影响,而通过适当的岩土风险管理可以避免许多此类风险。最后,本文提出了有关铁路项目的岩土工程风险评估和管理的建议,以及对铁路行业的好处。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号