首页> 外文会议>IABSE conference on engineering the developing world >Design of Sea-Crossing High-Speed Railway Steel-Concrete Composite Box Girder Cable-Stayed Bridge
【24h】

Design of Sea-Crossing High-Speed Railway Steel-Concrete Composite Box Girder Cable-Stayed Bridge

机译:跨海高速铁路钢混凝土组合箱梁斜拉桥设计

获取原文

摘要

Quanzhou Bay Railway Bridge is the key component of the Fuzhou-Xiamen High-Speed Railway with the design speed of 350 km/h. The total length of 20.3 km is the greatest among the sea-crossing high-speed railway bridges in the world. The main structure over the main navigation channel is a steel-concrete composite cable-stayed bridge with the span arrangement of ( 70+130+400+130+70) m. The main girder adopts a closed and streamlined box section. In the past decades, the sea-crossing railway cable-stayed bridges mostly adopted steel truss girder. Quanzhou Bay Railway Bridge is the first railway bridge adopting the steel-concrete composite box girder cable-stayed bridge type in china and the longest-span sea-crossing highspeed railway bridge in the world. In this paper, the structural design and construction method for this bridge are presented.
机译:泉州湾铁路大桥是福厦高铁的关键组成部分,设计时速为350 km / h。在世界跨海高速铁路桥梁中,全长20.3公里是最大的。主导航通道上的主要结构是跨度为(70 + 130 + 400 + 130 + 70)m的钢混凝土复合斜拉桥。主梁采用封闭的流线型箱形截面。在过去的几十年中,跨海铁路斜拉桥大多采用钢桁架梁。泉州湾铁路大桥是中国第一座采用钢-混凝土组合箱梁斜拉桥的桥梁,也是世界上跨度最长的跨海高速铁路桥梁。本文介绍了该桥的结构设计和施工方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号