首页>
外国专利>
- Manufacturing Method of Efficient Steel-Concrete Composite Girder Construction Method of Continuous Bridges using such Composite Girder and Continuous Bridges constructed by such Method
- Manufacturing Method of Efficient Steel-Concrete Composite Girder Construction Method of Continuous Bridges using such Composite Girder and Continuous Bridges constructed by such Method
展开▼
机译:-使用这种复合梁的连续桥的高效钢-混凝土复合梁施工方法的制造方法以及以此方法建造的连续桥
展开▼
页面导航
摘要
著录项
相似文献
摘要
The present invention relates to a method for manufacturing an efficient steel-concrete composite girder, a continuous bridge construction method using the same, and a continuous bridge constructed by the continuous bridge construction method. A reinforcement material for a transverse beam is installed in a waist portion of a steel girder of which both end parts are supported in a manufacturing step, and a connection rod is held by the reinforcement material to support a mold. Moreover, concrete is poured into the mold and cured, and the installed reinforcement material for a transverse beam and the installed mold are removed in order to increase economic efficiency and maintenance efficiency.
展开▼