Moody Lake Adaptive Management Water Quality Improvement Project

机译:穆迪湖适应管理水质改善项目

获取原文

摘要

With limited funding available, maximizing water quality project efficiency is crucial in order to meet local community goals as well as state standards. Effectively targeting the highest loading sources are key. The Pareto principle (also known as the 80/20 rule) states that, for many events, roughly 80% of the effects come from 20% of the causes. This can be widely observed in the field of watershed management where a large proportion of non-point source pollution originates from one or few areas or sites. In this presentation we use Moody Lake as an example of the value of investing in pre-project diagnostic monitoring as well as post-project effectiveness monitoring to maximize cost-benefits of water quality improvement projects. Intensive monitoring of tributary streams revealed that implementation in one wetland complex within the watershed could achieve approximately 80% of the watershed phosphorus load reductions needed for Moody Lake to meet water quality standards (mean summer phosphorus concentration of 40 μg/L), with a 25-year life cycle cost of just $38-53 per pound of phosphorus removed.
机译:在可用资金有限的情况下,最大限度地提高水质项目效率对于满足当地社区目标和州标准至关重要。有效地针对最高负载源是关键。帕累托原理(也称为80/20规则)指出,在许多事件中,大约80%的影响来自20%的原因。这可以在流域管理领域中广泛观察到,在该流域中,大量的非点源污染来自一个或几个区域或场所。在本演示中,我们以穆迪湖(Moody Lake)为例,说明在项目前诊断监控以及项目后有效性监控方面进行投资的价值,以最大程度地提高水质改善项目的成本效益。对支流的深入监测表明,在流域内的一个湿地综合体中实施,可以达到穆迪湖满足水质标准(夏季平均磷浓度为40μg/ L)所需的流域磷负荷减少量的大约80%,其中25生命周期成本每磅磷的去除成本仅为38-53美元。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号