Moody Lake Adaptive Management Water Quality Improvement Project

机译:喜怒无常的湖自适应管理水质改进项目

获取原文

摘要

With limited funding available, maximizing water quality project efficiency is crucial in order to meet local community goals as well as state standards. Effectively targeting the highest loading sources are key. The Pareto principle (also known as the 80/20 rule) states that, for many events, roughly 80% of the effects come from 20% of the causes. This can be widely observed in the field of watershed management where a large proportion of non-point source pollution originates from one or few areas or sites. In this presentation we use Moody Lake as an example of the value of investing in pre-project diagnostic monitoring as well as post-project effectiveness monitoring to maximize cost-benefits of water quality improvement projects. Intensive monitoring of tributary streams revealed that implementation in one wetland complex within the watershed could achieve approximately 80% of the watershed phosphorus load reductions needed for Moody Lake to meet water quality standards (mean summer phosphorus concentration of 40 μg/L), with a 25-year life cycle cost of just $38-53 per pound of phosphorus removed.
机译:提供有限的资金,最大化水质项目效率至关重要,以满足当地社区目标以及国家标准。有效地瞄准最高装载来源是关键。帕累托原则(也称为80/20规则)指出,对于许多事件,大约80%的效果来自20%的原因。这可以在流域管理领域中广泛观察到,其中大部分非点源污染来自一个或几个区域或地点。在本演示文稿中,我们使用Moody Lake作为投资预先预先诊断监测的价值以及项目后效能监测的例子,以最大限度地提高水质改善项目的成本效益。对支流流的密集监测揭示了流域内的一层湿地复合物中的实施可以达到喜怒无常的湖泊所需的分水岭磷负荷减少的大约80%,以满足水质标准(平均夏季磷浓度为40μg/ L),其中25次 - 减少了每磅磷的近38-53美元的寿命周期。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号