首页> 外文会议>Offshore technology conference >Integrated Subsea Supplier-Led Solution: A Case Study
【24h】

Integrated Subsea Supplier-Led Solution: A Case Study

机译:集成的海底供应商主导的解决方案:案例研究

获取原文

摘要

There is a global trend for integrated subsea alliances to be involved in projects earlier, with a broader scope and in closer collaboration with the operating company. Sometimes, this is achieved by enabling contractors to develop and propose their own field development concept, known as a supplier-led solution (SLS). This paper refers to a case study that demonstrates an effective way to improve project economics. A benchmark field layout plan was first generated using the customer's reference case. Then, a fully unconstrained SLS was developed to challenge and improve this reference case based on six main factors: 1. Integrated production system modelling 2. Fit-for-purpose project and design scoping 3. Alternative field architecture 4. Use of standardization 5. Use of supplier or industry specification 6. Integrated project execution A production assessment, cost estimation, and schedule were developed first for the reference case, fully compliant with the customer specifications, and with no deviation to the scope of work, and second, for the completely unconstrained SLS. Comparing the SLS to the reference case for this case study, the main improvements were as follows: 1. Accelerated production thanks to integrated modelling and the introduction of subsea boosting technology 2. Significant improvement in capex of approximately 41% 3. Accelerated schedule due to a proposed innovative bidding process and a reduced equipment lead time enabled by standardization 4. Lower project risk profile by improving the execution predictability primarily due to the integrated subsea offering The combination of these improvements resulted in better project economic viability and allowed lower contingency cost accruals due to proactive risk management. The SLS also helped the operating company to build a viable development scenario in order to pass through the next project stage gate. This paper demonstrates how an integrated subsea alliance with a broad spectrum of capabilities from the reservoir to the surface can deliver value through fully integrated earlier engagement. The methodology presented in this paper can be customized for any offshore prospect; the only prerequisites are early engagement, access to required data, and the freedom for the contactors to develop their own solution, in coordination with the operating company. A key feature of the proposed methodology is to link the SLS to reservoir representation, which avoids the common pitfall of delivering capex savings at the expense of larger production (revenue) losses.
机译:在全球范围内,海底集成联盟越来越早地参与到项目中来,而且范围更广,与运营公司的合作也越来越紧密。有时,这是通过使承包商能够制定和提出自己的现场开发概念(称为供应商主导的解决方案(SLS))来实现的。本文引用了一个案例研究,该案例展示了一种提高项目经济性的有效方法。首先使用客户的参考案例生成基准测试场布局计划。然后,基于六个主要因素,开发了一种完全不受约束的SLS,以挑战和改进此参考案例:1.集成的生产系统建模2.适合用途的项目和设计范围3.替代现场架构4.使用标准化5。供应商或行业规范的使用6.集成项目执行首先,为参考案例开发了生产评估,成本估算和进度表,该参考案例完全符合客户的规范,并且不背离工作范围,其次,针对客户案例进行了评估。完全不受约束的SLS。将SLS与本案例研究的参考案例进行比较,主要改进如下:1.借助集成建模和海底增压技术的引入,加快了生产速度; 2.资本支出显着提高了约41%3.加速了进度,原因是提议的创新招标流程和标准化带来的设备交货时间缩短。4.主要由于集成了海底产品,提高了执行的可预测性,从而降低了项目风险,这些改进的结合带来了更好的项目经济可行性,并降低了应计的应急费用主动进行风险管理。 SLS还帮助运营公司建立了可行的开发方案,以便通过下一个项目阶段。本文演示了从储层到地面具有广泛功能的集成海底联盟如何通过完全集成的早期参与来交付价值。本文中介绍的方法可以针对任何离岸潜在客户进行定制;唯一的先决条件是尽早参与,访问所需数据以及与运营公司合作,让接触者自由开发自己的解决方案。拟议方法的一个关键特征是将SLS与储层表示法联系起来,从而避免了以节省大量生产(收入)为代价的节省资本支出的常见陷阱。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号