首页> 外文会议>Construction research congress >A Review of the Barriers to Implementing Project Risk Management and a Study of Their Impact on Electrical Contractors' Risk Maturity Levels
【24h】

A Review of the Barriers to Implementing Project Risk Management and a Study of Their Impact on Electrical Contractors' Risk Maturity Levels

机译:审查项目风险管理的实施障碍及其对电气承包商风险成熟度水平的影响的研究

获取原文

摘要

A recent study has shown a positive correlation between owner satisfaction during construction projects and the contractor's level of project risk management (PRM) capability. This capability can be measured and is known as risk maturity. Risk maturity can be improved within individuals and project teams. Both training and tools are available for improving risk maturity, however, previous studies have found that there are consistent barriers to implementing PRM. This paper provides a review of the barriers and identified five common PRM barriers. Risk maturity scores were captured for 25 contractors, additionally, the contractors were asked to rank order the five common barriers. This study measured the association and correlation between the rankings of the barriers and the risk maturity levels. Data is captured through surveys of electrical construction companies through a research grant with ELECTRI International. The associations between the barriers and risk maturity levels are identified with a Pearson correlation test and the correlation is tested through a linear regression analysis. Eight correlations were found between the levels of risk maturity and the barriers to implementing PRM. The findings from this research will help professionals and organizations identify and plan for the barriers to implementing PRM dependent on their risk maturity level. Keywords. Risk management; Barriers to risk management; Risk maturity.
机译:最近的一项研究表明,建设项目期间的业主满意度与承包商的项目风险管理(PRM)能力水平呈正相关。这种能力可以衡量,被称为风险成熟度。可以在个人和项目团队中提高风险成熟度。可以使用培训和工具来提高风险成熟度,但是,以前的研究发现,实施PRM一直存在障碍。本文概述了这些障碍,并确定了五个常见的PRM障碍。捕获了25个承包商的风险成熟度得分,此外,还要求承包商对五个常见障碍进行排序。这项研究测量了障碍等级与风险成熟度等级之间的关联和相关性。数据是通过与ELECTRI International的研究资助对电气建筑公司进行的调查而收集的。障碍与风险成熟度水平之间的关联通过Pearson相关检验确定,并通过线性回归分析对关联进行检验。在风险成熟度水平与实施PRM的障碍之间发现了八种相关性。这项研究的结果将帮助专业人士和组织根据风险成熟度水平确定并计划实施PRM的障碍。关键字。风险管理;风险管理的障碍;风险成熟度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号