首页> 外文会议>Construction research congress >A Review of the Barriers to Implementing Project Risk Management and a Study of Their Impact on Electrical Contractors' Risk Maturity Levels
【24h】

A Review of the Barriers to Implementing Project Risk Management and a Study of Their Impact on Electrical Contractors' Risk Maturity Levels

机译:审查项目风险管理的障碍和对其对电力承包商风险成熟度的影响研究

获取原文

摘要

A recent study has shown a positive correlation between owner satisfaction during construction projects and the contractor's level of project risk management (PRM) capability. This capability can be measured and is known as risk maturity. Risk maturity can be improved within individuals and project teams. Both training and tools are available for improving risk maturity, however, previous studies have found that there are consistent barriers to implementing PRM. This paper provides a review of the barriers and identified five common PRM barriers. Risk maturity scores were captured for 25 contractors, additionally, the contractors were asked to rank order the five common barriers. This study measured the association and correlation between the rankings of the barriers and the risk maturity levels. Data is captured through surveys of electrical construction companies through a research grant with ELECTRI International. The associations between the barriers and risk maturity levels are identified with a Pearson correlation test and the correlation is tested through a linear regression analysis. Eight correlations were found between the levels of risk maturity and the barriers to implementing PRM. The findings from this research will help professionals and organizations identify and plan for the barriers to implementing PRM dependent on their risk maturity level. Keywords. Risk management; Barriers to risk management; Risk maturity.
机译:最近的一项研究表明在建项目和项目风险管理(PRM)能力的承包商的水平老板满意度之间的正相关关系。这种能力可以衡量和被称为风险成熟。风险成熟度的个人和项目团队内得到改善。培训和工具可用于改善风险成熟度,然而,先前的研究已经发现,对于实施PRM一致的障碍。本文提供的障碍,并确定了五个共同PRM壁垒进行审查。风险成熟度得分被抓获的25个承包商,另外,承包商被要求排名顺序的五个常见的障碍。这项研究衡量的障碍排名和风险成熟度级别之间的关联和相互关系。数据通过电力建设公司的调查,通过与国际ELECTRI科研补助金抓获。的障碍和风险成熟度水平之间的关联被确定与Pearson相关测试和的相关性通过线性回归分析来测试。风险成熟度的水平和障碍,实现PRM之间发现八个关系。从这项研究结果将帮助专业人士和组织确定和规划的障碍,实现PRM取决于其风险成熟度。关键词。风险管理;贸易壁垒风险管理;风险成熟。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号