首页> 外文会议>IEEE/PES Transmission and Distribution Conference and Exposition >A Practical Guide of Troubleshooting IEC 61850 GOOSE Communication
【24h】

A Practical Guide of Troubleshooting IEC 61850 GOOSE Communication

机译:IEC 61850 GOOSE通信故障排除实用指南

获取原文

摘要

IEC 61850 GOOSE (Generic Object-Oriented Substation Event) communication has been implemented in many substation automation applications, such as automatic transfer scheme, bus protection and power management system. With advantages introduced by GOOSE, it also brings challenges to protection and control engineers. Massive content of IEC 61580 standard, new technologies IEC 61850 implemented and slow adoption are main reasons for lacking of troubleshooting guideline. Special design of GOOSE in IEC 61850 makes troubleshooting more difficult. This paper examines GOOSE configuration, message structure, parameters, and actual communication capture in detail, analyses different fault situations in real world, evaluates communication diagnostic features, and provides a systematic troubleshooting approach for troubleshooting GOOSE communication issues. A new criteria Average Commission Time (ACT) is used to measure the average time and cost for system commission of each relay. This approach has been adopted in system integration for the past three years. System commissioning time measured (ACT) was improved by 75%. System integration and commissioning cost have been dramatically saved.
机译:IEC 61850 GOOSE(面向对象的通用变电站事件)通信已在许多变电站自动化应用中实现,例如自动传输方案,总线保护和电源管理系统。凭借GOOSE引入的优势,它也给保护和控制工程师带来了挑战。缺少故障排除准则的主要原因是IEC 61580标准的内容丰富,IEC 61850的新技术实施和采用缓慢。 IEC 61850中GOOSE的特殊设计使故障排除更加困难。本文详细检查了GOOSE的配置,消息结构,参数和实际的通信捕获,分析了现实世界中的各种故障情况,评估了通信诊断功能,并提供了用于解决GOOSE通信问题的系统故障排除方法。新标准“平均调试时间”(ACT)用于测量每个继电器的平均时间和系统调试成本。在过去的三年中,这种方法已在系统集成中采用。测得的系统调试时间(ACT)缩短了75%。系统集成和调试成本已大大节省。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号