首页> 外文会议>IABSE conference on engineering the developing world >Study on correction of linear and internal force of steel box girder bridge based on Zero moment method
【24h】

Study on correction of linear and internal force of steel box girder bridge based on Zero moment method

机译:基于零时刻法的钢箱梁桥梁线性和内部力的校正研究

获取原文

摘要

In actual engineering, the assembly error of the beam in the construction process may cause the system linearity not to meet the design requirements. In this paper, the zero-moment method is proposed to study the construction of continuous large span steel box girder bridge. Firstly, find the position of the zero moment of the girder beam, secondly, cut the girder beam at the position of zero moment to make the beam become three-span simply supported structure, then re-weld the girder beam after the linear adjusted. The results demonstrate that the design requirements of system linearity and internal force of the beam can be meet by using the Zero moment method.
机译:在实际工程中,施工过程中光束的装配误差可能导致系统线性不符合设计要求。本文提出了零点方法研究了连续大跨度钢箱梁桥的构造。首先,找到梁梁的零时刻的位置,其次,将梁梁切割为零时刻的位置,使光束变为三跨的三跨,然后在线性调节后重新焊接梁梁。结果表明,通过使用零时刻方法可以满足系统线性度和梁内部力的设计要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号