首页> 外文会议>Pipelines conference >Life Cycle Cost Analysis of an Underground Freight Transportation (UFT) System in Texas
【24h】

Life Cycle Cost Analysis of an Underground Freight Transportation (UFT) System in Texas

机译:德克萨斯州地下货运(UFT)系统的生命周期成本分析

获取原文

摘要

Life cycle cost analysis is a critical step in feasibility study of infrastructure systems. Life cycle cost analysis of innovative infrastructure systems, such as Underground Freight Transportation (UFT) systems is often challenging since there is not much historical cost information about these systems. Underground freight transportation (UFT) is a class of automated transportation systems in which vehicles carry freight through tunnels or pipelines between intermodal terminals. The objective of this paper is to estimate the capital and annual costs of a UFT system in Texas, designed to transport shipping containers from port of Houston to Dallas via a 25-ft diameter tunnel. The UFT system has major capital cost components including tunnel construction cost, linear induction motor cost, and vehicle cost. The annual cost components of the UFT system are maintenance cost, energy consumption cost, and administration cost. Historical tunneling costs were used to create a regression model to estimate costs of tunnels with various sizes. Quotes from the industry and RSMeans cost data were used to estimate costs of vehicles, propulsion system, UFT maintenance, energy consumption, and administration. The preliminary capital cost estimate for the UFT system is approximately $53 million per mile and the preliminary annual cost is approximately $150 million per year. These results inform transportation planners about estimated construction, maintenance, and operation costs of the UFT system. They also show how life cycle cost of an underground transportation system can be estimated using limited historical cost information.
机译:生命周期成本分析是基础架构系统可行性研究中的关键步骤。创新的基础设施系统(例如地下货运(UFT)系统)的生命周期成本分析通常具有挑战性,因为有关这些系统的历史成本信息不多。地下货物运输(UFT)是一类自动运输系统,其中车辆通过联运码头之间的隧道或管道运送货物。本文的目的是估算德克萨斯州UFT系统的资金和年度成本,该系统旨在通过直径25英尺的隧道将货运集装箱从休斯敦港口运输到达拉斯。 UFT系统具有主要的资本成本组成部分,包括隧道建设成本,线性感应电动机成本和车辆成本。 UFT系统的年度成本组成部分是维护成本,能耗成本和管理成本。历史隧道成本用于创建回归模型,以估算各种规模的隧道成本。使用行业报价和RSMeans成本数据来估算车辆,推进系统,UFT维护,能源消耗和管理的成本。 UFT系统的初步资本成本估算约为每英里5300万美元,而年度年度成本约为每年1.5亿美元。这些结果可以使运输计划人员了解UFT系统的估计建设,维护和运营成本。它们还显示了如何使用有限的历史成本信息来估算地下运输系统的生命周期成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号