Evolution of USACE Seepage Cutoff Wall Contracts

机译:USACE防渗墙合同的演变

获取原文
获取外文期刊封面目录资料

摘要

A major goal of each US Army Corps of Engineers (USACE) project is to capture lessons learned and communicate them forward from project to project. This permits sharing of knowledge and experiences nationwide and helps improve the USACE contractual methodologies, reducing overall costs, and improving designs. An example of this is the evolution of seepage barrier wall contracts. From the first Wolf Creek Dam cutoff wall in the 1970's to the more recent Bolivar and East Branch Dam cutoff walls, documentation and sharing of lessons learned have increased the efficiency and effectiveness of cutoff wall designs and contract specifications. The evolution process includes updates in contract philosophy, methods for verifying that construction meets design requirements, and inclusion of effective data management solutions for use both during construction and long-term documentation of the project.
机译:每个美国陆军工程师(USACE)项目的主要目标是捕获所吸取的经验教训,并将它们从项目转发到项目。这允许在全国范围内分享知识和经验,并有助于改善USACE合同方法,降低整体成本和改进设计。这一例子是渗流障碍墙合同的演变。从1970年的第一个狼溪大坝截止墙到最近的玻利维尔和东分支坝截止墙,文件和分享经验教训已经提高了截止墙设计和合同规范的效率和有效性。演进过程包括合同哲学的更新,验证该建筑符合设计要求的方法,以及在项目的建设和长期文档中包含有效的数据管理解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号