Structural Diaphragm Walls at the Red Rock Hydroelectric Project

机译:红岩水电项目的结构地下连续墙

获取原文
获取外文期刊封面目录资料

摘要

The Red Rock Hydroelectric Project is currently under construction at the existing U.S. Army Corps of Engineers Red Rock Dam on the Des Moines River near Pella, Iowa. A reinforced concrete diaphragm wall constructed of large T-shaped panels was required to form the intake approach channel for the project. In the permanent condition, the wall will be a 69-foot-high cantilever with total depth of 130 feet, including the soil and rock socket, to retain the upstream slope of the existing embankment dam. The diaphragm wall will also be utilized for excavation support during construction of the intake structure and upstream penstocks. An additional diaphragm wall was constructed along the crest of the dam to form a cutoff wall. Both diaphragm walls are critical elements for maintaining dam safety during construction and throughout the life of the project. Therefore, quality control during excavation and construction was paramount.
机译:红岩水电项目目前正在爱荷华州佩拉附近的得梅因河上现有的美国陆军工程兵红岩水坝上建设。需要使用大型T形面板构造的钢筋混凝土隔膜墙,以形成该项目的进水通道。在永久状态下,该墙将是一个69英尺高的悬臂,总深度为130英尺(包括土壤和岩石承窝),以保留现有堤坝的上游坡度。隔板壁也将在进气结构和上游压力管道的建造过程中用于挖掘支撑。沿着大坝的顶部建造了一个额外的隔板墙,形成了一个防渗墙。两个隔板壁都是在施工期间和项目整个生命周期中维护大坝安全的关键要素。因此,在开挖和施工过程中进行质量控制至关重要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号