Underground Challenges on the Wilburton Sewer Project: Complex Design Elements are Put to the Test During Construction

机译:Wilburton下水道项目的地下挑战:在施工过程中对复杂的设计元素进行测试

获取原文

摘要

This paper discusses the construction of two unique design elements for the City of Bellevue Wilburton Sewer project that were presented at the 2015 ASCE Pipelines conference. The project included 4,300 feet of new 12-inch to 30-inch diameter sewer, with an alignment traversing a peat bog, creek, ten lanes of Interstate 405 (I-405), a Lexus car dealership, a major arterial, and a retaining wall along I-405. These challenging site and soil constraints were navigated by a wide range of design solutions and technologies, including: supporting the pipe on auger cast piles, backfilling the pipe with geofoam, prescribing specialized shoring systems, crossing under the arterial using trenchless technology, CIPP rehabilitation of an existing pipeline, and complex bypass pumping arrangements. This paper focuses on the significant underground risks associated with the installation of the auger-cast piles through the peat bog and the deep trenchless guided bore crossing across Main Street, and summarizes the effectiveness of these design solutions during construction for this complex sewer replacement project in Bellevue, Washington.
机译:本文讨论了贝尔维尤市威伯顿市污水处理厂项目的两个独特设计元素的构建,这些元素在2015年ASCE管道会议上进行了介绍。该项目包括4,300英尺的新的12英寸至30英寸直径的下水道,并穿过泥炭沼泽,小溪,十号州际405(I-405)车道,雷克萨斯汽车经销店,主要干道和护墙。沿I-405穿墙。这些具有挑战性的场地和土壤限制条件通过多种设计解决方案和技术来解决,其中包括:将管道支撑在螺旋钻桩上,用泡沫土回填管道,规定专门的支撑系统,使用无挖沟技术在动脉下穿越,CIPP修复。现有的管道和复杂的旁通泵布置。本文着眼于通过泥炭沼泽和穿过主街的深部非开挖导向钻孔穿越安装螺旋钻桩所带来的重大地下风险,并总结了在施工过程中这些设计解决方案在该复杂的下水道置换项目中的有效性。华盛顿州贝尔维尤。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号