BUILDING CALIFORNIA HIGH-SPEED RAIL: A LOOK AT THE FIRST CONSTRUCTION PACKAGE

机译:建造加州高速铁路:第一个施工方案一览

获取原文

摘要

In August 2013, the California High-Speed Rail Authority embarked on an exciting and groundbreaking new chapter in both California's and the nation's history with the $1 billion award of the first construction package of the California High-Speed Train project to Tutor Perini/Zachry/Parsons (TPZP), a Joint Venture. Construction Package 1 (CP1) consists of 32 miles of new double-track high-speed train (HST) guideway starting north of the City of Madera and ending south of the City of Fresno. The HST system is designed to accommodate passenger rail service up to 220 mph. The majority of the HST alignment is parallel and adjacent to active BNSF, Union Pacific Railroad and San Joaquin Valley Railroad main lines, requiring numerous new railroad grade separations. CP1 includes 23 new railroad overpasses, 4 new railroad underpasses, 2 major HST trenches, 3 HST viaducts and 3 separate railroad shooflies. The key rail design considerations associated with the construction of the new HST trench and the railroad underpasses in downtown Fresno are the implementation and phasing of the shooflies required to maintain active railroad operations. This paper will present the complicated track phasing and railroad cut-overs required for the 3 CP1 shooflies highlighting the challenges faced, and the innovative solutions that were developed by the TPZP design team, in constructing the high-speed train infrastructure in a dense, urban setting.
机译:2013年8月,加利福尼亚州高铁管理局通过向Tutor Perini / Zachry /合资企业Parsons(TPZP)。建设包1(CP1)包含32英里的新双轨高速列车(HST)导轨,从马德拉市北部开始,到弗雷斯诺市南部结束。 HST系统旨在容纳时速达220英里的客运铁路。大部分HST路线平行于BNSF,联合太平洋铁路和圣华金谷铁路干线,并需要大量新的铁路坡度分隔。 CP1包括23个新的铁路立交桥,4个新的铁路立交桥,2个主要的HST沟槽,3个HST高架桥和3个单独的铁路地下通道。与新的HST沟槽和弗雷斯诺市区的地下通道的建设相关的主要铁路设计考虑因素是维持活跃的铁路运营所需的基础设施的实施和阶段。本文将介绍3个CP1旁架所需的复杂的移相和铁路交接,以突出面临的挑战,以及TPZP设计团队开发的创新解决方案,以在人口稠密的城市中建设高速列车基础设施环境。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号