【24h】

Tunneling Uphill Through Tight DC Corridors

机译:通过紧密的DC走廊上山

获取原文

摘要

DC Water owns and maintains sanitary sewers in the District of Columbia. Four interceptors in this system, at the north end of the District, cross the western half of Rock Creek Park owned by the National Park Service. The objective of this project is to design, bid and build a replacement interceptor through the park to allow the abandonment of three deteriorated interceptors. The only option allowed by the Park Service was an alignment though the only paved roadway in the area – Bingham Drive. This new interceptor will also accommodate the future abandonment of other nearby interceptors that also run through stream valleys in the park.This paper details the design approach and construction methods used for eight trenchless installations of 24-inch interceptors, including a single 1,345-foot tunnel bore through rock, along narrow roadways, and congested utility corridors in a maturely-forested and high-end residential neighborhood, while complying with the sometimes-conflicting requirements of six jurisdictional agencies.
机译:DC Water在哥伦比亚特区拥有并维护下水道。在该系统的北端,该系统中的四个拦截器越过了国家公园管理局(National Park Service)拥有的罗克克里克公园(Rock Creek Park)的西半部。该项目的目的是通过公园设计,招标和建造一个替代拦截器,以允许放弃三个性能下降的拦截器。 Park Service允许的唯一选择是通过该地区唯一的铺装道路-Bingham Drive进行路线调整。这种新的拦截器还将适应未来其他附近的拦截器的使用,这些拦截器也穿过公园的溪谷。 本文详细介绍了八种24英寸拦截器的非开挖安装的设计方法和施工方法,其中包括一条1,345英尺长的穿越岩石的隧道,沿着狭窄的道路,以及在森林茂密的高端住宅区中拥挤的公用设施走廊。 ,同时遵守六个司法管辖区机构有时相互冲突的要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号