首页> 外文会议>AIAA space forum >Space Launch System: Development Status
【24h】

Space Launch System: Development Status

机译:太空发射系统:发展状况

获取原文

摘要

The SLS Program is on track for a 2018 launch, and with Orion, will provide the capability of achieving human exploration, operations and science objectives for a variety of Beyond Earth Orbit (BEO) missions, including Crewed Cis-lunar missions in the 2020s and Crewed Mars missions in the 2030s. The SLS program has a full S2.0B funding for FY 2016 and is in the production phase. The SLS program-level CDR was completed in 2015; SLS Block 1 has flight hardware in production with a late 2018 Initial Launch capability. The uprated Block 1B version is funded for the Exploration Upper Stage (EUS). The RS-25 engine production restart is on contract. The Michoud Assembly Facility (MAF) SLS VAC weld / assembly tools are in operation, and the LO2 and LH2 tank weld confidence articles are completed, as is the LH2 qualification tank. The SLS program covers development, engineering sustainment, pad and launch site infrastructure.
机译:SLS计划将于2018年启动,并与Orion一起提供实现人类超越各种地球轨道(BEO)任务的人类探索,运营和科学目标的能力,包括2020年代的机组人员顺月球任务和在2030年代执行了火星任务。 SLS计划在2016财年拥有S2.0B的全部资金,并且处于生产阶段。 SLS程序级CDR已于2015年完成; SLS Block 1生产的飞行硬件具有2018年底的首次启动能力。升级后的1B区块版本是为勘探高层(EUS)提供资金的。 RS-25发动机的生产重新启动已按照合同进行。 Michoud组装设施(MAF)SLS VAC焊接/组装工具正在运行,并且LO2和LH2储罐焊接置信性物品以及LH2合格储罐也已完成。 SLS计划涵盖开发,工程维护,基地和发射场基础设施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号