Innovative Bridge Foundations Reduce Track Outage - BNSF Bellefontaine Bridge, Bellefontaine, Missouri

机译:创新的桥梁基础可减少轨道中断-BNSF贝尔方丹桥,密苏里州贝尔方丹

获取原文

摘要

The Bellefontaine Bridge was constructed over the Missouri River over 100 years ago and is still in use despite its long life. BNSF Railway placed the bridge on the capital replacement list for 2014-2015. A new bridge would have to be constructed along the same alignment as the existing structure because of environmental permitting and the proximity of another bridge that had been built directly to its south. Keeping an existing bridge in service during creation of a new structure—in a fairly tight right-of-way constrained by wetlands and the DOT structure—would have been challenging enough. In this case, the subsurface conditions, consisting of 50 to 60 feet of weak alluvial deposits overlying another 100 feet of dense sands down to the top of rock at 165 feet below grade, made the installation of new foundations for the structure even more difficult. The project team designed and built an innovative composite foundation consisting of large-diameter drilled shafts through the alluvial material, with micropiles socketed into sound bedrock. This foundation not only minimized costs, but also reduced the risk of movement of the existing shallow pile-supported bridge during construction of the foundations and substructure for the new bridge. The new structure was built beneath the existing bridge, and then short track windows were utilized to complete the superstructure. This paper discusses the design and construction of the foundation solution, as well as provides load test data.
机译:Bellefontaine桥建于100多年前,位于密苏里河上,尽管使用寿命长,但仍在使用。 BNSF铁路将该桥列为2014-2015年的资本置换清单。由于环境许可以及直接在其南部建造的另一座桥梁附近,将不得不按照与现有结构相同的路线建造一座新桥梁。在创建新结构的过程中保持现有桥梁的服务(在湿地和DOT结构所约束的相当紧的通行权中)将具有足够的挑战性。在这种情况下,地下条件包括50至60英尺的薄弱冲积物,再覆盖100英尺的致密砂岩,直至地平面以下165英尺的岩石顶部,这使得为该结构安装新的基础变得更加困难。该项目团队设计并建造了一个创新的复合基础,该基础由穿过冲积材料的大直径钻杆组成,并且将微型桩装在稳固的基岩中。该基础不仅使成本降到最低,而且还降低了在建造新桥的基础和下部结构期间现有浅桩支撑桥梁移动的风险。新结构建在现有桥下,然后利用短轨道窗完成上层建筑。本文讨论了基础解决方案的设计和构建,并提供了负载测试数据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号