UPRR Bridge 183.67 Springfield Sub Over 9th Street (Springfield, IL)

机译:UPRR桥183.67 Springfield Sub Over 9th Street(伊利诺伊州斯普林菲尔德)

获取原文

摘要

As part of the Chicago to St Louis High Speed Rail Corridor project, one critical bridge replacement was over 9~(th) Street in Springfield, IL. The existing 4 span ballasted thru-plate girder structure had become structurally deficient to support the upgraded service in this corridor. Due to the highly skewed alignment relative to the roadway, clearance requirements, and planned future street widening, a single track 188'-0" span (out to out of steel) Thru-plate Girder (TPG) span on skewed abutments was selected. The new span is designed to current AREMA E80 loading standards. Selection of a long span TPG eliminated the center pier between existing traffic lanes and allows for street widening and sidewalk upgrades by the community in the future. Fabrication of the TPG span occurred in El Centra, CA and Coolidge, AZ. Components were trucked 1500 miles to Springfield in individual girder segments up to a maximum 109' length and weighing up to 78 tons each. Total weight of the steel span is 943,000 pounds. Due to schedule constraints, only partial fit-up of the span's 35'-40' skewed end sections were performed in Arizona. With excellent coordination between Union Pacific Railroad, local contractor (Halverson Construction), the fabricator (Stinger Bridge & Iron/ EW Corporation), and HDR Engineering, the demolition, final erection and roll-in of this new span was completed in less than two weeks and placed in service October 2015.
机译:作为芝加哥至圣路易斯高铁走廊项目的一部分,伊利诺伊州斯普林菲尔德市的9号街上进行了一次重要的桥梁更换。现有的4跨压载直通大梁结构在结构上不足以支持该走廊的升级服务。由于相对于行车道的高度偏斜对齐,间隙要求以及计划的未来街道拓宽,因此选择了偏斜基台上的单轨188'-0“跨度(从钢到钢)跨度的跨接式大梁(TPG)。新的跨度是按照当前的AREMA E80装载标准设计的,选择了大跨度的TPG可以消除现有行车道之间的中心墩,并允许社区将来进行街道加宽和人行道升级。分别在最大的109'长,最大重达78吨的单个大梁段中以1500英里的距离将零部件运输到Springfield,钢跨度的总重量为943,000磅。在亚利桑那州进行了跨度为35'-40'的倾斜端部的装配。在当地的承包商联合太平洋铁路公司(Halverson Construction),制造商(Stinger Bridge&Iron / EW Corp)之间进行了出色的协调(HDR Engineering)和HDR Engineering,此新跨度的拆卸,最终安装和滚动在不到两周的时间内完成,并于2015年10月投入使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号