UPRR Bridge 183.67 Springfield Sub Over 9th Street (Springfield, IL)

机译:UPRR Bridge 183.67 Springfield Sub over第9街(Springfield,IL)

获取原文

摘要

As part of the Chicago to St Louis High Speed Rail Corridor project, one critical bridge replacement was over 9~(th) Street in Springfield, IL. The existing 4 span ballasted thru-plate girder structure had become structurally deficient to support the upgraded service in this corridor. Due to the highly skewed alignment relative to the roadway, clearance requirements, and planned future street widening, a single track 188'-0" span (out to out of steel) Thru-plate Girder (TPG) span on skewed abutments was selected. The new span is designed to current AREMA E80 loading standards. Selection of a long span TPG eliminated the center pier between existing traffic lanes and allows for street widening and sidewalk upgrades by the community in the future. Fabrication of the TPG span occurred in El Centra, CA and Coolidge, AZ. Components were trucked 1500 miles to Springfield in individual girder segments up to a maximum 109' length and weighing up to 78 tons each. Total weight of the steel span is 943,000 pounds. Due to schedule constraints, only partial fit-up of the span's 35'-40' skewed end sections were performed in Arizona. With excellent coordination between Union Pacific Railroad, local contractor (Halverson Construction), the fabricator (Stinger Bridge & Iron/ EW Corporation), and HDR Engineering, the demolition, final erection and roll-in of this new span was completed in less than two weeks and placed in service October 2015.
机译:作为芝加哥对圣路易斯高速轨道走廊项目的一部分,一个关键桥梁替换率超过9〜(Th)街道,IL。现有的4跨度凸起通过板梁结构在结构上不足,以支持该走廊的升级服务。由于相对于巷道,间隙要求和计划未来街道扩大的高度倾斜,选择了一条轨道188'-0“跨度(TPG)跨越偏斜的斜坡上的横向支座(TPG)跨度。新跨度旨在旨在目前的arema E80装载标准。选择长跨度TPG在现有交通车道之间消除了中心码头,并在未来允许街道扩大和人行道升级。在EL Centra的制造发生了TPG跨度的制造,AZ CA和Coolidge。部件以最大109英寸的单个梁段运输到斯普林菲尔德,最大109英寸,每次重达78吨。钢跨度的总重量为943,000磅。由于安排限制,仅部分在亚利桑那州进行了跨度的35'-40'偏斜的末端部分。联合太平洋铁路,本地承包商(Halverson Construction),制造商(Stinger Bridge&Iron / EW Corp oriration)和HDR工程,拆迁,最终勃起和滚入这一新跨度的少于两周,并于2015年10月服务。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号