首页> 外文会议>ITA-AITES world tunnel congress >Transient Face Support in Slurry Shield Tunneling Due to Different Time Scales for Excavation Sequence of Cutting Tools and Penetration Time of Support Fluid
【24h】

Transient Face Support in Slurry Shield Tunneling Due to Different Time Scales for Excavation Sequence of Cutting Tools and Penetration Time of Support Fluid

机译:切削刀具开挖顺序和支撑液渗透时间不同的时标导致的泥水盾构隧道瞬态面支撑

获取原文

摘要

The support pressure of a slurry shield corresponds to the in situ earth and groundwater pressure to ensure the stability of the tunnel face. The support fluid (bentonite suspension) penetrates from the excavation chamber into the pore space and transfers the support pressure to the granular structure of the soil within this zone. At the same time, the cutting tools rotate periodically with the cutting wheel and remove the penetrated soil up to a certain cutting depth at the face. Shortly after the tool passing, the penetration process starts again. Both, the support pressure and the soil excavation, act in the same direction at the tunnel face, but they are subject to different cyclic intervals. This relationship between the time needed for the transient penetration process and the interval of the cyclic passage of the cutting tools at a local point at the face is examined and the impact onto the global face stability is discussed.
机译:泥水盾构的支撑压力对应于原地土压力和地下水压力,以确保隧道工作面的稳定性。支撑液(膨润土悬浮液)从开挖腔进入孔隙空间,并将支撑压力传递到该区域内的土壤颗粒结构中。同时,切割工具会随着切割轮的旋转而周期性地旋转,并清除穿透的土壤,直到在工作面达到一定的切割深度为止。刀具通过后不久,再次开始渗透过程。支护压力和土方开挖在隧道工作面沿相同的方向作用,但是它们受到不同的循环间隔。检查了瞬态穿透过程所需时间与切削工具在工作面局部点处的循环通过间隔之间的关系,并讨论了对整体工作面稳定性的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号