首页> 外文会议>World Tunnel Congress >Transient Face Support in Slurry Shield Tunneling Due to Different Time Scales for Excavation Sequence of Cutting Tools and Penetration Time of Support Fluid
【24h】

Transient Face Support in Slurry Shield Tunneling Due to Different Time Scales for Excavation Sequence of Cutting Tools and Penetration Time of Support Fluid

机译:由于不同时间尺度的切削术和渗透时间的挖掘序列以及支撑液的穿透时间,瞬态面支撑隧穿隧道

获取原文

摘要

The support pressure of a slurry shield corresponds to the in situ earth and groundwater pressure to ensure the stability of the tunnel face. The support fluid (bentonite suspension) penetrates from the excavation chamber into the pore space and transfers the support pressure to the granular structure of the soil within this zone. At the same time, the cutting tools rotate periodically with the cutting wheel and remove the penetrated soil up to a certain cutting depth at the face. Shortly after the tool passing, the penetration process starts again.Both, the support pressure and the soil excavation, act in the same direction at the tunnel face, but they are subject to different cyclic intervals. This relationship between the time needed for the transient penetration process and the interval of the cyclic passage of the cutting tools at a local point at the face is examined and the impact onto the global face stability is discussed.
机译:浆料屏蔽的支撑压力对应于原位接地和地下水压,以确保隧道面的稳定性。支撑液(膨润土悬浮液)从挖掘室中穿过挖掘室进入孔隙空间,并将支撑压力转移到该区域内土的颗粒结构。同时,切割工具周期性地旋转切割轮,并将穿透的土壤除去,直到面部的某个切割深度。在工具通过后不久,渗透过程重新开始。距离,支撑压力和土壤挖掘,在隧道面上的相同方向行动,但它们受到不同的循环间隔。检查瞬态穿透过程所需的时间和切割工具的循环通道间隔之间的这种关系被检查在面部的局部点处,并讨论了对全局面稳定性的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号