Schedule Performance of Construction Manager at Risk (CMAR) Delivery on Pipeline Engineering and Construction Projects

机译:计划在管道工程和建设项目中交付施工经理的风险(CMAR)绩效

获取原文

摘要

Much of the water and wastewater lines in the United States are nearing the end of their useful life. A significant reinvestment is needed in the upcoming decades to replace or rehabilitate the water and wastewater infrastructure in the U.S. Currently, the traditional method for delivering water and wastewater pipeline engineering and construction projects is design-bid-build (DBB). The traditional DBB delivery system is a sequential low-integration process and can lead to inefficiencies and adverse relationships between stakeholders. Alternative project delivery methods (APDM) such as construction manager at risk (CMAR) have been introduced to increase stakeholder integration and ultimately enhance project performance. Schedule performance can have significant impacts on pipeline projects and can be a major contributor to cost growth. However, the schedule performance of CMAR projects in the pipeline engineering and construction industry has not been quantitatively studied. The objective of this paper is to develop a baseline for the schedule performance of CMAR water and wastewater pipeline projects. The research objective will be accomplished by administering a quantitative survey developed to facilitate the data collection from 53 projects, followed by a statistical analysis of the schedule performance data. The results show an average schedule growth of 1.77%, which is notably less than the typical schedule growth observed with other delivery systems. This research contributes to the body of knowledge by providing the first quantitative study of CMAR schedule performance for pipelines engineering and construction projects.
机译:美国的许多供水和废水管线的使用寿命即将结束。在接下来的几十年中,需要大量的再投资来替换或修复美国的水和废水基础设施。目前,用于输送水和废水管道工程和建设项目的传统方法是“设计—投标—建造”(DBB)。传统的DBB交付系统是一个顺序的低集成过程,并且可能导致效率低下和利益相关者之间的不利关系。引入了替代项目交付方法(APDM),例如施工风险管理人员(CMAR),以增强利益相关者的整合并最终提高项目绩效。进度绩效可能会对管道项目产生重大影响,并且可能是成本增长的主要因素。但是,尚未对CMAR项目在管道工程和建筑行业中的进度绩效进行定量研究。本文的目的是为CMAR水和废水管道项目的进度绩效制定基准。将通过进行定量调查以促进从53个项目收集数据,然后对进度绩效数据进行统计分析,来实现研究目标。结果显示,平均进度增长为1.77%,这明显低于其他交付系统所观察到的典型进度增长。通过对管道工程和建设项目的CMAR进度性能进行首次定量研究,该研究有助于知识体系的发展。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号