首页> 外文会议>International Conference on Advanced Computer Science and Information Systems >The evaluation of information technology governance and the prioritization of process improvement using control objectives for information and related technology version 5: Case study on the ministry of foreign affairs
【24h】

The evaluation of information technology governance and the prioritization of process improvement using control objectives for information and related technology version 5: Case study on the ministry of foreign affairs

机译:使用信息和相关技术的控制目标对信息技术治理进行评估并确定流程改进的优先顺序,第5版:外交部案例研究

获取原文

摘要

According to 2015 Performance Reports, the Ministry of Foreign Affairs' Key Performance Indicator (KPI): Percentage of Information Technology Master Plan Implementation performance falls into the poor category. Through root cause analysis, it is identified that the KPI's poor performance is caused by the evaluation of information technology (IT) governance has never been performed. By performing such evaluation, the organzation's status of IT governance can be determined, and then based on the status constructs the recommendations for improvement. COBIT 5 framework was used in this study as a frame of reference for assessing the capability level of the Ministry of Foreign Affairs' IT governance, prioritizing and constructing the recommendations for process improvement. The assessment of process capability using Process Assessment Model (PAM) generates an average rating of 0.7, where 1 process is at level 2 (managed), 15 processes are at level 1 (performed), and 21 processes are still at level 0 (incomplete). Prioritization using pain points yields 15 prioritized processes for immediate improvement. The recommendations for improvement are constructed using the provided COBIT 5's guidance, in the form of activities and best practices for each IT process.
机译:根据《 2015年绩效报告》,外交部的关键绩效指标(KPI):信息技术总体规划的实施百分比属于较差的类别。通过根本原因分析,可以确定KPI的性能不佳是由于从未进行过信息技术(IT)治理评估而引起的。通过执行这种评估,可以确定组织的IT治理状态,然后根据该状态构建改进建议。本研究使用COBIT 5框架作为评估外交部IT治理能力水平,确定优先顺序并构建改进流程建议的参考框架。使用过程评估模型(PAM)对过程能力进行评估的平均评分为0.7,其中1个过程处于2级(受管理),15个过程处于1级(已执行),还有21个过程仍处于0级(未完成) )。使用痛点进行优先排序会产生15个优先流程,可以立即得到改善。使用提供的COBIT 5指南以每个IT流程的活动和最佳实践的形式构建改进建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号