首页> 外文会议>ITA-AITES world tunnel congress >Back Analysis of High Tunnel Convergences in Clayey Marls
【24h】

Back Analysis of High Tunnel Convergences in Clayey Marls

机译:Clayey Marls高隧道收敛性的反分析

获取原文

摘要

During the excavation of the Ganntas Tunnel, in the Algerian Atlas mountain area, high convergences occurred slightly after temporary support installation, and re-profiling operations were carried out along more than 100 m of tunnel. The failure occurred when the tunnel face reached a faulted zone in clayey marls with an overburden of about 100 m. The geological investigations proved to be insufficient at design stage since the presence of such material along the tunnel alignment was unknown until the construction stage.
机译:在阿尔及利亚阿特拉斯山脉地区的Ganntas隧道开挖期间,临时支护安装后略有高收敛性,并在100 m以上的隧道中进行了重新压模作业。当隧道工作面到达黏土质泥灰岩的一个断层带,覆盖层约100 m时,便发生了破坏。在设计阶段,地质调查被证明是不够的,因为直到施工阶段才知道沿隧道路线的这种材料的存在。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号