Tunnelling Under the Fraser River at 6 Bar: Design and Construction of the Port Mann Main Water Supply Tunnel

机译:弗雷泽河下6巴的隧道:曼港主供水隧道的设计与施工

获取原文
获取外文期刊封面目录资料

摘要

The Port Mann Main Water Supply Tunnel project provides a critical water main crossing of the Fraser River for the owner, Greater Vancouver Water District (Metro Vancouver). The project consists of two 60-metre-deep slurry panel shafts and a 1-kilometre-long, 3.5-metre excavated diameter tunnel located near Vancouver, British Columbia, Canada. The initial tunnel lining is a precast concrete steel fiber reinforced gasketed segmental lining. The final lining is a 2.1-metre-diameter welded steel pipe. This paper describes the challenges encountered during tunnel construction and the solutions implemented. Key challenges include earth pressure balance tunnelling at up to 6 bar pressure-the highest to date in Canada-a water-crossing without surface access for the majority of the tunnel drive, ground freezing from a river platform for a critical TBM intervention, and boring through cobbles and boulders in dense glacial till.
机译:曼港主要供水隧道项目为业主大温哥华水区(温哥华市区)提供了弗雷泽河的重要水主通道。该项目包括两个深60米的泥浆板竖井和一个长1公里,直径3.5米的挖掘直径隧道,位于加拿大不列颠哥伦比亚省温哥华附近。最初的隧道衬砌是预制混凝土钢纤维增强的带垫片分段衬砌。最终衬里是直径2.1米的焊接钢管。本文介绍了在隧道施工过程中遇到的挑战以及所采取的解决方案。关键的挑战包括:在最高6 bar的压力下进行土压力平衡隧穿-这是加拿大迄今为止最高的-大部分隧道驱动装置都没有地面通道的水上穿越,河道平台的地面冻结以进行关键的TBM干预以及无聊穿过鹅卵石和巨石在浓密的冰川中耕种。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号