首页> 外文会议>Canadian Society for Civil Engineering annual conference >CONSOLIDATION SETTLEMENT OF VARVED CLAY DUE TO TUNNEL AND SHAFT CONSTRUCTION
【24h】

CONSOLIDATION SETTLEMENT OF VARVED CLAY DUE TO TUNNEL AND SHAFT CONSTRUCTION

机译:隧道和竖井施工引起的黏土固结沉降

获取原文

摘要

Construction of South Tunnel project in Hartford, Connecticut, USA requires a launch shaft, starter and tail tunnels and a large diameter circular pump station. These structures will require excavation through 25 m of overburden soils and 25 m of bedrock. Overburden soils include approximately 10 m thick layer of soft and compressible varved clay. Lowering of groundwater above or below varved clay as a result of South Tunnel construction will cause a reduction of groundwater level and increase in the effective stress in varved clay. Given adequate time, this increase in effective stress will result in consolidation settlement. There are existing facilities in the vicinity of the launch shaft area where ground movement should be minimized. This paper discusses the method of analyses and presents the results of estimated settlements and mitigation measures.
机译:美国康涅狄格州哈特福德市南部隧道项目的建设需要一个发射井,起步隧道和尾部隧道以及一个大口径圆形泵站。这些结构需要开挖25 m的表土和25 m的基岩。覆盖土包括约10 m厚的柔软且可压缩的裂隙粘土层。由于南部隧道的建设,地下水下降到裂隙粘土以上或以下将导致地下水位降低,并且使裂隙粘土的有效应力增加。如果有足够的时间,有效应力的这种增加将导致合并结算。在发射井附近有一些设施,应尽量减少地面运动。本文讨论了分析方法,并提出了估计的沉降量和缓解措施的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号