Measuring Performance on P3 Projects through a Systematic Requirements Management Program

机译:通过系统需求管理计划测量P3项目的性能

获取原文

摘要

When an infrastructure fails prematurely because of poor workmanship, the Developer of a Public Private Partnership (P3) project incurs a significant cost that typically could have been prevented if a more systematic attention to higher risk requirements had of been in place. This practice paper will demonstrate how a risk based requirements verification system has been applied on a number of major transportation P3 projects as a way of addressing just such a problem. By using a total digital approach to design review and construction inspection, and by applying a systematic risk profiling approach, more and better performance verification data can be collected to clearly and objectively depict the status of the project. With this approach, developers can move beyond just saying they want a high quality project, they can actually determine with a measured level of confidence, what the level of performance is being observed. A lower level of performance is a predictor of possible future failures. The traditional approach of describing the scope of a transportation project has been by writing text in paragraph format or creating a series of books that read somewhat like a novel. The scoping of the work can be greatly improved by capturing all the expectations or requirements within a relational database structure. With each requirement identified, any number of attributes can be related, such as risk, owner, phase, cost, method of verification and observed performance. As the design effort is completed, the applicable design input requirements can be verified to ensure that they have been appropriately incorporates into the design. The performance of the design team to meet the requirements when the design is reviewed can be measured and the result used to identify areas or disciplines that are under-performing. Similarly when the design is realized on the worksite, the performance of the construction forces can be measured to objectively identify strong performers and underperforming efforts. Poor performance can be addressed early in the life of the project and not later when the cost impact can be multiple times higher.
机译:当基础设施过早地失败时,由于工艺差,公共私人伙伴关系的开发商(P3)项目遭遇了大量成本,如果对更高的风险需求进行更具系统的注意力,通常可以防止。这种实践论文将展示如何在许多主要交通P3项目上应用基于风险的需求验证系统,以解决此类问题的方式。通过使用总数字方法来设计审查和施工检查,通过应用系统风险分析方法,可以收集更多和更好的性能验证数据,以清楚地妨碍项目的状态。通过这种方法,开发人员可以超越只是说他们想要一个高质量的项目,他们实际上可以用测量的置信度确定,观察到的性能水平。较低的性能是可能的未来失败的预测因素。描述运输项目范围的传统方法是通过段落格式写作文本或创建一系列书籍,这些书读得一定像小说。通过在关系数据库结构中捕获所有期望或要求,可以大大提高工作的范围。通过确定每个要求,任何数量的属性都可以是相关的,例如风险,所有者,阶段,成本,验证方法和观察性能。随着设计工作完成,可以验证适用的设计输入要求,以确保它们已被适当地包含到设计中。设计团队的表现可以测量设计设计时的要求,结果用于识别出于绩效不足的地区或学科的结果。同样,当设计在工地上实现时,可以测量施工力的性能,以客观地识别强大的表现者和表现不佳的努力。在项目的生命期间早期表现不佳,而且在成本影响可能多次更高时,不稍后。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号