Heavy lift analysis at FEED stage for industrial project

机译:工业项目FEED阶段的重型举升分析

获取原文
获取外文期刊封面目录资料

摘要

Modular construction has been a widely used method for industrial construction in Alberta. Heavy piperack modules are prefabricated and assembled offsite and transported to site for installation, which minimizes the impact of Alberta's harsh weather and improves efficiency. Such projects are large in scale, ranging from hundreds of modules to thousands; because of this, project planning often requires a relatively long period of time. At the front-end engineering design stage, information is limited, but the planning is critical for determining the appropriate cranes, locations, and lift sequences. To ensure sound planning, information must be extracted from the 3D models, which can be tedious without automation, and engineering analyses are required for crane location selection. This paper introduces a data-driven management system used for project planning. The outputs include selection of crane with locations considering site constraints. Valid automation is implemented in practice to achieve high efficiency.
机译:模块化建筑已成为艾伯塔省工业建筑中广泛使用的方法。重型吊架模块在现场进行预制和组装,然后运送到现场进行安装,从而最大程度地减少了艾伯塔省恶劣天气的影响并提高了效率。这样的项目规模很大,从数百个模块到数千个模块不等。因此,项目计划通常需要相对较长的时间。在前端工程设计阶段,信息有限,但是规划对于确定合适的起重机,位置和举升顺序至关重要。为了确保合理的计划,必须从3D模型中提取信息,这在没有自动化的情况下可能很繁琐,并且需要对起重机的位置进行工程分析。本文介绍了一种用于项目计划的数据驱动的管理系统。输出包括选择起重机的位置,并考虑现场限制。在实践中实施有效的自动化以实现高效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号