首页> 外文会议>IEEE/PES Transmission and Distribution Conference and Exposition >Methods for 'Live Line' OPGW Cables Stringing at Voltage Levels of 400 kV and 765kV
【24h】

Methods for 'Live Line' OPGW Cables Stringing at Voltage Levels of 400 kV and 765kV

机译:“Live Line”OPGW电缆的方法串行电压电平400 kV和765kV

获取原文

摘要

Presently, CVG EDELCA is carrying out a replacement project of more than 1360 km of conventional ground wires, installing OPGW cables along with the primary and regional transmission systems operating at high voltage levels such as 765 kV, 400 kV, and 230 kV. Ideally, executing this kind of project requires the outage of the lines as a fundamental rule or precaution. However, is not possible to, in most cases, disrupt power; for that reason it forces us to execute the stringing process with the power lines in operation. CVG EDELCA is carrying out the replacement of 1360 km of conventional ground wires with OPGW which has allowed us to get to know different methodologies for OPGW cable installation on live lines. In this paper, the acquired experiences and details about stringing methods and safety measures are presented, as well as the used equipment used and other related aspects.
机译:目前,CVG Edelca正在进行超过1360千米的常规地线的替代项目,安装OPGW电缆以及在高压电平的主要和区域传动系统,如765 kV,400 kV和230 kV。理想情况下,执行此类项目要求将线条中断作为基本规则或预防措施。但是,在大多数情况下,不可能破坏权力;因此,它迫使我们在操作中执行带电源线的串行过程。 CVG Edelca正在进行1360公里的传统地线,其中opgw允许我们了解在实时线路上的OPGW电缆安装的不同方法。在本文中,提出了关于布线方法和安全措施的获取经验和细节,以及所使用的使用设备和其他相关方面。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号