首页> 外文会议>Chinese Intelligent Systems Conference >Chapter 15 A Multi-objective Dual-Resource Shop Scheduling Model Considering the Differences Between Operational Efficiency
【24h】

Chapter 15 A Multi-objective Dual-Resource Shop Scheduling Model Considering the Differences Between Operational Efficiency

机译:第15章考虑运营效率之间差异的多目标双资源店调度模型

获取原文

摘要

Multiple resource constraints exist widely in the actual job shop under the complicate manufacturing environment, so a multi-objective dual-resource shop scheduling model considering the differences between operational efficiency is established, which contains two resource constraints: the machines and workers. An improved SPEA2 is proposed for the model which achieves three goals: the shortest completion time, the lowest cost and the minimum total tardiness. Since the evolutionary operation in the traditional algorithm for single-resource model has not been able to meet requirements of the model in this paper, the chromosome coding, chromosome decoding, initialization of the population, crossover operation and mutation operation are especially improved so that the machines and workers can be assigned to the process reasonably. Finally, the feasibility and efficiency of the model are proved by the simulation experiment.
机译:在复杂的制造环境中,在实际作业商店中存在多个资源限制,因此建立了考虑操作效率之间差异的多目标双资源店调度模型,其中包含两个资源限制:机器和工人。提出了一种改进的SPEA2,用于实现三个目标的模型:最短的完工时间,成本最低和最小总迟到。由于传统的单资源模型算法的进化操作尚未能够满足本文的模型的要求,因此染色体编码,染色体解码,群体的初始化,互动操作和突变操作尤其得到了尤其改善可以合理地将机器和工人分配到该过程。最后,通过仿真实验证明了模型的可行性和效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号